Komis Deposit: Geological Model
- Preliminary underground mine design used to calculate a Potential Minable Portion of the Resource of 129,500 tonnes at 7.66 g/t gold for 31,900 ounces.
- Mine access through existing ramp to 120 metres (394 feet) vertical depth.
- Initial plans are to mine to 175 metres (574 feet).
- Mine to be developed for production beginning in 2011.
Komis Deposit: Resource Model
Mineral Resource Block Model
Oblique View Facing Northeast
Komis is untested beneath 175 m and high-grade gold zones are open to depth and along strike.





